Supreme Energy obtains a drilling exploration license for Mount Rajabasa in West lampung

PT Supreme Energy Rajabasa

Pre-Feasibility Study

Under the Decrees of the Minister of Energy and Mineral Resource (ESDM) issued in 2008, PT. Supreme Energy was assigned to conduct pre-feasibility studies in Gunung Rajabasa geothermal prospects.

Image

This assignment was completed in 2009 within the time specified in the decrees. The studies successfully estimated the possible reserves and established the concession area for each of the prospects based on the conceptual models constructed by the integration of geological, geophysical, geochemical data and prior wells.
Geotechnical data was added in order to identify any constraints or hazards for development of the field. The earth science data acquired during the pre-feasibility studies was used to estimate resource size of the prospects.

Read the article..

The jakarta Post: Drilling begins on Rantau Dedap plant, Sumatra


Leave a comment